ALD Engineering and Construction company is one of the contractors that has completed a certain part of the construction of bridges in Zaporizhzhya. It is the most priority project according to the President of Ukraine. The construction of Zaporizhzhya bridges is the object number one of the National Program "Great Construction".

Our company has worked on structures No. 1 and No. 5 of the new girder bridge connecting the Khortitsky district and Khortitsa. We have the appropriate license and can carry out a wide range of construction work on such large and socially significant objects. ALD specialists obtain the required qualifications.

Our workers dismantled the old barrier fence, repaired support No. 5, as well as defective parts of the support, cracks, and installed new metal bumpers, etc. at the entrance to the girder bridge. The work was carried out efficiently and on time.

We joined the construction of the most long-awaited object for the Cossacks participating in the implementation of work part on the Zaporozhye bridges

It is a very important object for Zaporozhye. Its construction has been expected for more than decades. It is very honorable to be involved in these large-scale works.

Several years of work on the bridges were stopped and resumed on April 10th, 2020. In July last year, large-scale work began on the girder bridge. President Volodymyr Zelenskyy opened traffic on one lane of the girder bridge across the Old Dnieper on December 24th, 2020. The largest lifting crane in Europe, Lifting Chart LK-800 (Zakhariy) arrived at the construction site at the beginning of the year. Works are in full swing on the girder and cable-stayed bridges now. The facility employs about 500 people. Work on nine facilities is carried out around the clock.

The Zaporozhians finally got a hope that the bridge will be completed this year. The construction of bridge will solve a serious transport problem for the entire Zaporozhye. Thus, a reliable transport connection between the Right-Bank and Left-Bank parts of the city will be provided.